Skip to content

Infrastructure

Eastbank River Crossing

A 420 m dual-carriageway crossing built with precast segmental construction over a navigable channel, kept open to shipping throughout the 26-month programme.

Eastbank River Crossing photograph 1Eastbank River Crossing photograph 2Eastbank River Crossing photograph 3

Technologies used

  • Segmental box girder
  • Cathodic protection
  • Structural health monitoring
  • Precast piers