Infrastructure
Eastbank River Crossing
A 420 m dual-carriageway crossing built with precast segmental construction over a navigable channel, kept open to shipping throughout the 26-month programme.
Technologies used
- Segmental box girder
- Cathodic protection
- Structural health monitoring
- Precast piers
